Goldratt's Blog

Sharing TOC knowledge directly from the founder
  • Home
  • About Dr. Eliyahu M. Goldratt
23 Feb 2010

Theory of Constraints Golden Nugget
#5 – Assessing super rapid time at an early stage

(RRR)

To fully enroll the Rapid Response (RR) offer, without taking a risk of deteriorating Reliability, it is required to shrink the production buffer to less than one quarter of the industry lead time. Reaching that stage takes substantial time. Much before that stage – when load control is implemented – the lead time is shorter than half the industry lead time. Since the financial benefits of getting even a fraction of the orders in RR prices are so significant, the S&T tree recommends to start offering RR on a limited volume (less than ten percent of the capacity) immediately after load-control is put in place. We know that the company can safely offer lead times which are half the industry lead time as rapid service, but what can the company offer, at that early stage, as super-rapid service?…Click here to continue reading

Tags: goldratt, Lead Time, Nuggets, Production Buffer, RRR, S&T Tree, theory of constraints

This entry was posted on Tuesday, February 23rd, 2010 at 11:58 AM and is filed under General. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply

Click here to cancel reply.

You must be logged in to post a comment.

« Theory of Constraints Golden Nugget
#4 – Inventory target, Asymmetric time constants
Supply Chain article – Golden Rules »
  • Subscribe

    • Entries (RSS)
    • Comments (RSS)
  • Archives


  • Calendar

    September 2010
    M T W T F S S
    « Jul    
     12345
    6789101112
    13141516171819
    20212223242526
    27282930  

  • Tags

    batch progression Buffer Management Change Clarke Ching Color Psychology DDP goldratt Interview Inventory Isn't It Obvious Judging change Lead Time MTA MTO Nuggets operations Organizational Change Production Production Buffer Resisting Change RRR S&T Tree strategy and tactics supply chain The Goal theory of constraints thinking processes toc viable vision warehouse

  • Categories

    • General
    • Nuggets

  • Meta

    • Log in
    • Entries RSS
    • Comments RSS
    • WordPress.org

Goldratt's Blog is proudly powered by WordPress
Entries (RSS) and Comments (RSS).